Summary
Overview
Work History
Education
Skills
Timeline
Generic

Davin Boudreaux

Livingston

Summary

20 Years experience in construction.

Detail-oriented Supervisor brings extensive construction background and specialized experience on challenging projects. Smoothly leads team members to meet goals, maximize performance and maintain important safety standards. Knowledgeable about applicable codes and industry best practices.

Resourceful Turnaround Planner recognized for high productivity and efficient task completion. Possess specialized skills in project management, risk assessment, and workflow optimization critical to navigating complex turnaround projects. Excel in strategic planning, communication, and problem-solving, ensuring seamless operations and project success. Committed to leveraging these abilities to drive improvements and achieve operational excellence.

Overview

12
12
years of professional experience

Work History

Turnaround Planner

Optimal Field Svcs
Plaquemine
01.2024 - 11.2025
  • Developed turnaround plans for operational efficiency and cost reduction.
  • Analyzed field data to identify areas for process improvement.
  • Collaborated with cross-functional teams to implement strategic initiatives.
  • Created detailed reports outlining project progress and recommendations.
  • Streamlined workflows to enhance team productivity and effectiveness.
  • Provided guidance and support to junior planners during project execution.
  • Collaborated closely with vendors and suppliers throughout all stages of a project's duration in order to ensure timely delivery of materials needed for successful completion.
  • Developed and implemented turnaround plans to ensure the efficient and effective operation of production facilities.

Piping Supervisor

Trade Industries
Baton Rouge
11.2023 - 01.2024
  • Ensured all piping systems were designed, constructed and installed in accordance with applicable codes and standards.
  • Monitored welding activities to ensure compliance with quality assurance requirements.
  • Coordinated the installation of piping systems, equipment and components.
  • Inspected new and existing piping systems for accuracy and conformance to specifications.
  • Supervised the fabrication, assembly and testing of pipe spools prior to installation on-site.
  • Maintained inventory of necessary materials needed for successful completion of projects.
  • Conducted regular safety meetings with crew members to discuss job hazards and safe work practices.
  • Performed daily inspections of tools, equipment, machinery and other resources used during construction activities.
  • Developed detailed project plans for each phase of the project including timeframes, manpower needs and material requirements.
  • Provided technical guidance to junior engineers regarding design calculations, code requirements, material selection.
  • Reviewed drawings, specifications and test procedures related to piping systems installations or modifications.
  • Verified that welders are qualified according to ASME Section IX Welding Qualifications.
  • Assisted in resolving conflicts between subcontractors regarding scope of work or schedule issues.
  • Resolved any discrepancies between field conditions versus engineering documents.
  • Created reports summarizing completed tasks, remaining tasks and any potential delays.

Piping Superintendent

Optimal Field Services
Geismar
04.2022 - 11.2023
  • Monitored, evaluated and reported daily progress of piping activities to the Project Manager.
  • Supervised, trained and mentored a team of pipefitters in accordance with company policies and procedures.
  • Developed piping layout drawings utilizing AutoCAD software and other related tools.
  • Coordinated with other departments including engineering, maintenance, safety and quality assurance to ensure compliance with project requirements.
  • Ensured that all welding operations were conducted according to industry standards and regulations.
  • Inspected welds for adherence to ASME codes and standards.
  • Prepared weekly reports detailing progress on piping installation projects.
  • Maintained records of all piping materials used during construction projects.
  • Reviewed shop drawings for accuracy prior to fabrication.
  • Resolved technical issues related to piping systems as they arose during construction projects.
  • Analyzed material take-off data for accuracy before ordering supplies and equipment.
  • Ensured proper storage of pipes, fittings, valves, gaskets and other components used in piping systems.
  • Participated in job site safety meetings and ensured that crew members adhered to safety protocols at all times.
  • Created detailed work schedules for pipefitting crews based on project timelines and budget constraints.
  • Identified potential problems or delays in the process of installing pipes or associated components prior to them occurring.
  • Sourced vendors for purchasing necessary pipefitting supplies within budgetary limits.
  • Performed regular inspections of completed work areas to verify quality control measures had been followed correctly.
  • Implemented corrective action plans when nonconformities were discovered during inspection processes.
  • Provided guidance on best practices regarding installation techniques for various types of pipes or components.
  • Collaborated closely with the engineering department in order to determine optimal solutions for complex piping designs.
  • Prepared and planned worksites to help jobs run smoothly.
  • Delegated work to staff, setting priorities and goals.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Kept detailed progress records to hit strict deadlines and adjust plans.
  • Inspected sites before and after construction projects.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Coordinated phases of construction projects from inception to completion.

General Foreman

Excel Group
Prairieville
07.2017 - 03.2022
  • Ensured safety protocols were followed and maintained by all personnel on site.
  • Supervised, trained, and evaluated assigned personnel in accordance with company policies and procedures.
  • Provided technical advice to staff regarding operational issues and problems.
  • Developed and implemented job plans for construction projects.
  • Monitored project progress to ensure efficient use of resources and timely completion of tasks.
  • Performed inspections of completed work prior to acceptance by client or owner representative.
  • Resolved conflicts between workers regarding job assignments, methods, or deadlines.
  • Analyzed blueprints and other documents to plan layout of projects.
  • Maintained accurate records of daily operations including time cards, production data logs.
  • Oversaw all aspects of construction including scheduling personnel and supplies as needed.
  • Assisted in the preparation of bids for new contracts by providing input on labor costs and material requirements.
  • Identified potential risks associated with each project before beginning work.
  • Communicated regularly with team members about changes in scope or schedule.

Lead Pipe Fitter and Piping Foreman

Performance Industies
Baton Rouge
03.2014 - 02.2017
  • Performed preventative maintenance on equipment to ensure proper operation.
  • Installed piping systems for water, gas, steam and other liquids according to blueprints.
  • Fabricated metal components using welding and cutting tools.
  • Adjusted functional parts of mechanical devices as needed.
  • Tested newly installed systems for functionality prior to use.
  • Calibrated a range of instruments in accordance with manufacturer specifications.
  • Ensured all safety protocols were followed when handling hazardous materials.
  • Aligned machines properly for efficient operation.
  • Performed routine maintenance checks on all tools used in the job.
  • Maintained accurate records of work performed on each piece of equipment.
  • Read and interpreted specifications, diagrams and blueprints for job.
  • Threaded pipes using specified machinery.
  • Read and interpreted complex blueprints and drawings.
  • Handled all responsibilities for piping systems, including fabricating, assembling, installing and maintaining.
  • Assembled and disassembled boilers, tanks, vats, pressure vessels, exchangers and heaters according to blueprint specifications.

Education

GED -

Jewel M. Sumner High School
Kentwood, LA
03-2006

Skills

  • Piping design
  • Fabrication oversight
  • System testing
  • Piping design expertise
  • Shutdown planning
  • Blueprint interpretation
  • Materials estimation
  • Pre-construction planning
  • Computer-Aided Design
  • Blueprint Interpretation
  • Inspection Coordination
  • Documentation Review
  • Schedule Determination
  • Safe Operating Procedures
  • Team Leadership
  • Procedure Planning
  • Work Monitoring
  • Multi-Project Coordination
  • Problem-solving aptitude
  • Schedule oversight
  • Field Inspection
  • Site Safety
  • Project planning
  • Pipe fabrication
  • Material procurement
  • Quality control
  • Construction supervision
  • Turnaround planning
  • Scope development
  • Shutdown coordination
  • Scope management

Timeline

Turnaround Planner

Optimal Field Svcs
01.2024 - 11.2025

Piping Supervisor

Trade Industries
11.2023 - 01.2024

Piping Superintendent

Optimal Field Services
04.2022 - 11.2023

General Foreman

Excel Group
07.2017 - 03.2022

Lead Pipe Fitter and Piping Foreman

Performance Industies
03.2014 - 02.2017

GED -

Jewel M. Sumner High School
Davin Boudreaux