Currently I have the responsibility of making wiring harnesses and connecting the created harnesses to the necessary components on engine. I also have the responsibility of connecting, running and landing all premade WABTEC wiring harnesses into the ICB panel. I am also responsible for the pre-KAT alarm and shutdown testing required before operation of genset.